Tools and workflows for migrating a cluster, its persistent data, and its applications from GridGain 8 to GridGain 9.

This section guides you through migrating a cluster from GridGain 8 to GridGain 9, covering configuration, persistent data, codebase, and data center replication. Start with About Migration From GridGain 8 for an overview of what can and cannot be migrated.

What can and cannot be migrated when moving a cluster from GridGain 8 to GridGain 9, and where to start.

How to configure a GridGain 9 cluster to receive the components of a GridGain 8 cluster, either from the GridGain 8 configuration or from scratch.

Convert GridGain 8 caches to GridGain 9 tables, either by replicating caches or by migrating persistent storage files directly with the migration tool.

Run GridGain 8 client code against a GridGain 9 cluster with the migration adapter, configure the client connection, and rewrite collocated compute jobs.

Configure, run, secure, and monitor the DR connector tool that receives data from a GridGain 8 cluster and writes it into GridGain 9 tables.

Near-zero downtime migration from GridGain 8 to GridGain 9 using one-way data center replication: prepare tables, replicate, monitor, cut over, and roll back.

How SQL functions and data types map from GridGain 8 to the Calcite-based GridGain 9 engine: renamed, removed, and directly equivalent functions.